Projects

A Closer Look at Our Major Project Work

Bellfield Social Housing
Bellfield – Balmain & Co

Hard Scapes Package

  • 150 M2 of Laser Cut Patterned Sandblasted Exposed Concrete

  • 200 M2 of Concrete Paving Including All Footpaths, Basement Entry Ramps and Crossovers

  • Over 300 M2 Of Deep Lift Asphalt Road Reconstruction

Preston Crossing
Preston – Balmain & Co

Hard Scapes Package
 

  • 600 M2 of Concrete Paving with a Sandblasted Exposed Finish

  • 600 M2 of Trafficable Concrete Paving

  • 350 M2 of Palin Concrete Paving

  • 560 LM of Concrete Kerbing with Raised and Flush Kerbs

  • Decorative Saw Cuts

  • Over 700 M3 of Dirt Excavated and Removed from Site

  • Light Pole Bored Piers and Concrete

The Offices Project
Abbotsford – Balmain & Co

Street Scapes Package

  • Construction of 6 New Stormwater Side Entry Pits

  • Over 370 M2 of Asphalt Footpaths

  • 500 M2 of Asphalt Road Re-Sheeting Including Profiling Works

  • 100 LM of Bluestone Kerb and Channel Construction  

  • 140 LM of Concrete Kerb and Channel Works

  • All Line Markings

  • Street Sign Supply and Install

  • All Works Done With City Of Yarra

Woolworths Ecom &
Direct to Boot

Statewide – Multiple Contractors

  • Earthworks, Bulk and Detailed Works

  • Structural Concrete Works, Structural Foundations,  Bondeck Suspended Slabs, Raft Slabs

  • Concrete Pavement, Concrete Access Ramps, Carpark Works, Trench Reinstatements

  • Asphalt Works

  • In Ground Bollards

  • Line Marking

Rosehill High School
Niddrie – ARC3

Hard Scapes Package​
 

  • Over 650 M2 of Concrete Pavement

  • 140 LM of Kerb and Channel

  • 400 M2 of Asphalt Paving

  • Earthworks

  • All Relevant Sub Base Supply and Placement

Frankston Special
Development School

Frankston – ARC3

Earthworks & Hard Scapes Package
 

  • Over 2000 M3 of Excavated, Removed And Recycled Off Site

  • 2200 M2 of Concrete Pavement

  • 600 M2 Car Park Construction Including All Kerb, Channel and Asphalt Works

  • Over 400 M3 of Stabalised Sand Installed Under Car Park Sub Base

Taylors Lakes Primary School
Taylors Lakes – ARC3

Hard Scapes and Earthworks Package​
 

  • Over 1000 M3 of Dirt Excavate and Removed From Site

  • 1500 M2 of Asphalt Basket Ball Courts

  • Over 500 M2 of Concrete Paving Including DDA Compliant Access Ramps

  • 100 LM of Spoon Drain

Pakenham LDS Church
Pakenham – Gemcan

Carpark Construction & Concrete Paving

  • 1850 M2 Carpark Construction

  • 360 LM of Kerb and Channel Works

  • 720 M2 of Concrete Paving Works Including Internal 7 Council Footpaths Crossovers and Edge Strips

  • All Asphalt Works and Sub Base Works

  • Line Marking

  • 700 M2 Crushed Rock Over Flow Car Park Including Perimeter Flush Kerbs

Molesworth Place
North Melbourne – ARC3

Hard Scape and Structural Boundary Footing Package

  • 800 M2 Concrete Road Construction For Panel Trucks

  • 164 LM of Insitu Concrete Retaining Walls and Footings

  • 450 M2 of Concrete Underpave Works

  • 256 LM of Curved Insitu Concrete Retaining Walls

  • 250 M2 of Mixed Colored Concrete Paving Works

  • 450 M2 of Concrete Paving Works To Town House Court Yards

  • All Wheel Chair Access Ramps and External Structural Stairs

  • 280 LM Of Structural Footings Including All Excavation Steel Work And Concrete Placement